Air Toxics Notebook
Wood Furniture Manufacturing -  Subpart JJ

Applicability: eCFR Subpart JJ [ecfr.gov]

This subpart applies to:
  1. Facilities engaged, in part or in whole, in the manufacture of wood furniture or wood furniture components, and located at a Major Source of HAPs*.

Not subject to this subpart:
  1. Research or laboratory facilities;
  2. Surface coating of metal parts and products (other than metal components of wood furniture) subject to NESHAP MMMM;
  3. Surface coating of plastic parts and products (other than plastic components of wood furniture) subject to NESHAP PPPP;
  4. Surface coating of wood building products subject to NESHAP QQQQ;
  5. Surface coating of metal furniture subject to NESHAP RRRR.

*Major Sources of HAPs emit or have the potential to emit:
  • ≥ 10 tons/year of any single HAP; or
  • ≥ 25 tons/year of total HAPs.
  • Area Sources emit less than Major Sources.

Partial Exemptions**:
  1. Incidental wood furniture manufacturers.
**Certain rule requirements still apply. Please see rule text for full details.
Rules apply to small, area sources? No
Known Sources in NDEQ Jurisdiction:

Facility ID

Name
Location
23048
Store Kraft
Beatrice

Date of Original Final Rule: 12/7/95
Amendments Dates: 11/21/2011 - Final Rule
12/28/1998 - Amendments
06/03/1997 - Corrections
State Regulations (Title 129): As of September 28, 2022: Title 129, Chapter 13, Section 002.23

Previously: Chapter 28, Section 001.08.

Sources are also responsible for ensuring they are in compliance with current federal requirements found for this subpart in the CFR.

Federal Regulations: 40 CFR 63.800
Related Rules:

NESHAP – 40 CFR Part 63

Subpart QQQQ - Wood Building Products (surface coating)
Subpart RRRR - Metal Furniture (surface coating)
Subpart QQQQQQ - Wood Preserving (area sources)
Regulations and Federal Registers:
eCFR Subpart JJ [ecfr.gov]

(See attached file: 2J - Fed. Reg. 2011-11-21 - Final Residual Risk.pdf)

(See attached file: 2J - Fed. Reg. 1998-12-28 - Final Rule; amendments.pdf)

(See attached file: 2J - Fed. Reg. 1997-06-03 - Final Rule; correction.pdf)

(See attached file: 2J - Fed. Reg. 1995-12-07 - Final Rule and test method.pdf)

SizeFile Name
282 KB 2J - Fed. Reg. 2011-11-21 - Final Residual Risk.pdf
221 KB 2J - Fed. Reg. 1998-12-28 - Final Rule; amendments.pdf
124 KB 2J - Fed. Reg. 1997-06-03 - Final Rule; correction.pdf
445 KB 2J - Fed. Reg. 1995-12-07 - Final Rule and test method.pdf
Forms:
Important Dates: Source Classification (see EPA Guidance)
  • Existing source = construction/reconstruction on or before 12/6/1994
  • New source = construction/reconstruction after 12/6/1994
Initial Notification
  • Existing source = 8/29/1995
  • New source = As soon as possible before startup
Compliance Dates
  • Existing source
    • > 50 tons of HAP = 11/21/1997
    • < 50 tons of HAP = 12/7/1998
    • 11/21/11 standards = 11/21/14
  • New source = 12/7/1995 or upon startup
Initial Statement of Compliance Report & Workplan
  • 60 days after compliance date
Continuous Compliance Reports
  • Semi-annual
  • 7 months after compliance date and every 6 months after
  • Due on the 30th day following 6th month

FAQs, Fact Sheets, and Rule Summaries:
(See attached file: 2J - Overview.pdf)

(See attached file: 2J - EPA Guidance.pdf)

Texas CEQ - Rule Flowchart [tceq.texas.gov]

EPA's Subpart JJ Website [epa.gov] - contains federal register notices, technical information, guidance documents, and compliance tools

SizeFile Name
892 KB 2J - Overview.pdf
398 KB 2J - EPA Guidance.pdf
Presentations, Training and Articles:
Other Information and Resources:
Notes:
Page Last Updated: 12/2/22