002.02 When the applicant is required to obtain a State or other appropriate certification under section 401 of Clean Water Act and Title 120 and that certification has not been obtained or waived;
002.03 By the State Director where the Regional Administrator has objected to issuance of the permit;
002.04 When the imposition of conditions cannot ensure compliance with the applicable water quality requirements of all affected States;
002.05 When, in the judgment of the Secretary of the Army acting through the Chief of Engineers, anchorage and navigation in or on any of the waters of the United States would be substantially impaired by the discharge;
002.06 For the discharge of any radiological, chemical, or biological warfare agent or high-level radioactive waste;
002.07 For any discharge inconsistent with a plan or plan amendment approved under section 208(b) of the Clean Water Act;
002.08 To a new source or a new discharger, if the discharge from its construction or operation will cause or contribute to the violation of water quality standards. Any discharge from a new source or new discharger, if the discharge from the construction or operation of the facility will cause or contribute to the violation of water quality standards by the POTW to which it discharges. The owner or operator of a new source or new discharger proposing to discharge into a water segment which does not meet applicable water quality standards or is not expected to meet those standards even after the application of the effluent limitations required by sections 301(b)(1)(A) and 301(b)(1)(B) of the Clean Water Act, and for which the State or interstate agency has performed a pollutants load allocation for the pollutant to be discharged, must demonstrate, before the close of the public comment period, that:
002.08B The existing dischargers into that segment are subject to compliance schedules designed to bring the segment into compliance with applicable water quality standards. The Director may waive the submission of required information by the new source or new discharger if the Director determines that the Director already has adequate information to evaluate the request. An explanation of the development of limitations to meet the criteria of this paragraph is to be included in the fact sheet to the permit.